Company news
Calendar
Leningradsky branch of Kubanenergo is summing up the results of repair of high-voltage power lines
28.12.2017
The Power Engineering Institute of Kubanenergo and the Kuban State Agrarian University concluded a cooperation agreement
27.12.2017
8 thousand smart meters installed in Southwestern district
25.12.2017
Power industry specialists and local administration of Leningradsky district summed up the results of 2017
20.12.2017
Labinsk branch of Kubanenergo constructed and upgraded 20 facilities for grid connection
15.12.2017
Large substation upgraded in Armavir
11.12.2017
Kubanenergo is equipping power lines with modern power line fault detectors
08.12.2017
Seminar at Power Engineering Institute of Advanced Training of Kubanenergo: Innovations in Distribution Lines
07.12.2017
Southwestern branch of Kubanenergo processed more than 6 thousand applications for grid connection
04.12.2017
Employees from Kubanenergo took part in Chess Competition in Memory of M. Botvinnik
01.12.2017