Power engineers inspected 180km of power lines in the South-Western district
14.05.2019
From the beginning of 2019, engineers from the South-Western branch of Kubanenergo PJSC (Rosseti Group), have conducted a thermographic inspection on 10 high-voltage power lines totaling 180 km long in Anapa, Gelendzhik, Novorossiysk, Abinsk and Krymsk regions in order to prepare equipment for the summer peak demand,