Since the beginning of this year specialists from Ust-Labinskiy branch of Kubanenergo PJSC (Rosseti group) have constructed and upgraded 4 facilities: transformers and power lines for connection of new customers and increase of capacity in Tbilisskiy district, Krasnodar region.
Our engineers installed two transformer stations and a 10kV power line for customers of subsidized category. This category includes the consumers with allowed capacity of maximum 15kW and distance from the connection plot to the network not exceeding 500 metres in rural area and 300 metres in urban area. If all these requirements are met the cost of such connection is 550 rubles.
Mikhail Suvorov, director of Ust-Labinskiye electric networks, said: “When constructing power facilities we use high-tech equipment and materials. For the power lines we use self-supporting insulated conductor as it has perfect performance characteristics. Upgrading and new construction enables us to connect new consumers and ensure reliability and quality of power supply in settlements of Tbilisskiy district.”