Kubanenergo is installing power lines for agricultural enterprise in Belaya Glina
Back

Teams of Tikhoretskiye electric networks, branch of Kubanenergo PJSC (Rosseti group) are constructing overhead power lines to connect to power grids a construction plant of silage complex for storage of sunflower seed in village Belaya Glina, Krasnodar region.

Power engineers of Tikhoretsk branch of Kubanenergo are constructing 6.5 kilometers of 10 kV overhead power line. They have installed 170 pylons and 19.5 km of modern self-supporting insulated conductor, that is resistant to temperature and atmospheric effects influence. Besides, the modern conductor has long lifetime, and if operating conditions are fulfilled, it can serve more than 40 years. Self-supporting insulated conductor eliminates possibility of short circuits and unauthorized electric energy consumption, provides high reliability of power supply and electric safety.

Yuriy Stetsko, head of Beloglininskaya power distribution zone of Kubanenergo PJSC branch “Tikhorets power grids”, said: “These events will increase power and create conditions for technological connection to power grids of Kubanenergo of the construction plant of silage complex for storage of sunflower seed of total capacity 40 thousand tones in village Belaya Glina.”